首页> 外文会议>WINDPOWER >REVIEW OF OPERATION AND MAINTENANCE EXPERIENCE IN THE DOE-EPRI WIND TURBINE VERIFICATION PROGRAM
【24h】

REVIEW OF OPERATION AND MAINTENANCE EXPERIENCE IN THE DOE-EPRI WIND TURBINE VERIFICATION PROGRAM

机译:DOE-EPRI风力涡轮机验证计划的操作和维护经验审查

获取原文

摘要

All the projects within the U.S. Department of Energy (DOE) Electrical Power Research Institute (EPRI) Wind Turbine Verification Program (TVP) are now in operation. As a result, the emphasis of the owners and operators has shifted from installation and commissioning to a focus on optimizing the operation and maintenance (O&M) activities of the projects. Each project utilizes a unique strategy for performing O&M. O&M personnel for projects in Searsburg, Vermont; Glenmore, Wisconsin; Algona, Iowa; Springview, Nebraska; Kotzebue, Alaska; and Big Spring, Texas include on-site vendor representatives, dedicated utility personnel, and utility personnel who split their time between the wind turbines and other utility responsibilities. Each project has its own set of priorities for balancing turbine availability against safety, minimizing overtime pay, and other utility responsibilities. Various strategies have also been employed to ensure access to tools and spare parts. This paper compares and contrasts the various O&M strategies at TVP projects and reviews the causes of turbine downtime and the frequency and duration of faults.
机译:美国能源部(DOE)电力研究所(EPRI)风力涡轮机验证计划(TVP)的所有项目现在正在运行中。因此,所有者和运营商的重点是从安装和调试转移到专注于优化项目的运营和维护(O&M)活动。每个项目都利用独特的执行O&M策略。 O&M人员在佛蒙特州Searsburg的项目;格伦莫尔,威斯康星州;阿尔戈纳,爱荷华州;春天景观,内布拉斯加州; Kotzebue,阿拉斯加;德克萨斯州和大春天包括现场供应商代表,专用公用事业人员和公用事业人员,他们在风力涡轮机和其他实用职责之间分开了时间。每个项目都有自己的一组优先考虑,用于平衡涡轮机可用性,防止安全性,最大限度地减少加班费以及其他公用事业职责。还采用了各种策略来确保获得工具和备件。本文比较和对比TVP项目各种O&M策略,并审查了涡轮机停机和频率和持续时间的原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号