首页> 外文会议>North American tuneling : conference and exhibition >Frozen ground for building support―implementation of innovative engineering concepts for tunneling at Russia Wharf
【24h】

Frozen ground for building support―implementation of innovative engineering concepts for tunneling at Russia Wharf

机译:建立俄罗斯码头隧道隧道创新工程概念的支持的冻结理由

获取原文

摘要

It is often the owner who starts investigation into innovative construction techniques to gain better solutions for given underground needs, in particular in complex urban settings. In other cases the process may be contractor driven to produce a more competitive bid or offer a value engineering solution. Independent of the initiative, for a successful implementation of innovative techniques a mechanism has to be in place that involves all parties and leads to their agreement to a proposed solution. At Massachusetts Bay Transportation Authority's South Boston Piers Transit-way Section CC03A such a process led to implementation of an innovative tunneling scheme which relies on the use of groundfreezing for temporary building underpinning and shotcrete for tunnel support.
机译:它通常是开始调查创新施工技术,以获得更好的地下需求的解决方案,特别是在复杂的城市环境中。在其他情况下,该过程可能是承包商,以产生更具竞争力的出价或提供价值工程解决方案。独立于主动,成功实施创新技术,必须采用机制,涉及各方,并导致他们的协议达成拟议的解决方案。在马萨诸塞湾运输当局的南方波士顿码头转运方案部分CC03A这样的过程导致了一种创新的隧道方案,依赖于临时建筑物临时建筑物的临时建筑和隧道支撑的隧道方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号