Twenty-first century project delivery systems

机译:二十一世纪的项目交付系统

获取原文

摘要

The future of construction project delivery involves a variety of delivery systems, but far less reliance on design-bid-build as the dominant project delivery system. Construction management at-risk has overcome conflicts between the contractor and the design professional and created an environment in which the manager and the architect/engineer constructively collaborate to achieve a sound design. The use of design-build will increase as the single point of responsibility, faster delivery times and more predictable costs attract more adherents. The scant empirical evidence and short history of build-operate-transfer projects in the United States and abroad have yet to prove its viability as a routinely used alternative project delivery system. But with shrinking budgets and the advantages of working with the private sector, governmental entities are increasingly looking to privatization, public-private partnerships and other creative arrangements to help meet future infrastructure needs. Although there is some indication other methods have outperformed design-bid-build, no one would contend that any one method can be used to perform all projects, particularly those to meet our infrastructure needs. Given that much of the impetus and significant capital for the use of alternative project delivery methods through ISTEA and TEA-21 has been provided by government it is far more likely that we will witness a shift toward the flexible use of all delivery methods." Implicit in this prospect is the proposition that both the public and private sectors can deliver projects in acceptable fashion.
机译:建筑项目交付的未来涉及各种送货系统,但依赖于设计出价作为主导项目交付系统的依赖。风险施工管理已经克服承包商和设计专业人士之间的冲突,并创建了一个环境,其中经理和建筑师/工程师建设性地合作以实现健全的设计。使用设计建设将随着单一责任点而增加,更快的交货时间和更可预测的成本吸引更多的追随者。美国和国外建设运营的经验证据和缺乏历史尚未证明其作为经常使用的替代项目交付系统的可行性。但随着预算萎缩和与私营部门合作的优势,政府实体越来越多地期望私有化,公私伙伴关系和其他创造性安排,以帮助满足未来的基础设施需求。虽然有一些指示其他方法具有表现优于设计 - 出价,但没有人会争辩,任何一种方法都可以用于执行所有项目,特别是那些满足我们基础架构需求的方法。鉴于通过IST​​EA和TEA-21使用替代项目交付方法的大部分推动力和大量资本已由政府提供,我们将更有可能见证朝着灵活使用所有递送方法的转变。“隐含在这一前景中,公共和私营部门可以以可接受的方式提供项目的主张。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号