首页> 外文会议>IEEE Industrial Commercial Power Systems Technical Conference >Basic concepts and auto-check for clearing procedures
【24h】

Basic concepts and auto-check for clearing procedures

机译:基本概念和自动检查清算程序

获取原文

摘要

Everyone who interacts with an electrical power system knows that for all operating occurrences a complete control of the system is necessary.Safety when working in presence of electricity is a universal goal. Finding practical methods to achieve this safety, however, is not always easy or obvious.Maintenance personnel must take the necessary steps to assure that the system or portion of the system on which they plan to work is in an electrically safe working condition [1].The accepted, reliable way to provide safety is to de-energize the equipment first, then to connect the equipment to ground so that it cannot be re-energized. If there is no electrical power, there is no risk of electrical injury.Complexity of the electrical system normally determines the level of detail planning required for system clearing procedures. Complex power distribution systems that may have several sources into an area require several switching steps to isolate aportion of the system. It is necessary to use more elaborate clearing procedures and written switching instructions for systems together with a single-line diagram [1].The instructions and/or procedures should include verifying that the power has been removed (by live line testing or other means,) followed by the placing of grounds and locking/tagging of isolating devices[1].The clearing procedures should be completely written, checked and understood by all persons involved before applying them to any portion of the power distribution system.This paper considers the subject from both European and American point of view. It investigates the basic concepts and definitions to give prominence to operating bonds and to help the procedure-project. It proposes some simple rules, a graphicalrepresentation and an algebraic model of electrical status to allow an auto-check of the clearing procedure.
机译:与电力系统交互的每个人都知道,对于所有操作发生,都必须完全控制系统。在存在电力时,安全是一种普遍的目标。然而,寻找实现这种安全的实用方法并不总是容易或明显的。请求人员必须采取必要的步骤,以确保他们计划工作的系统的系统或部分是在电动工作状态[1] 。提供安全的接受,可靠的方法是首先将设备断电,然后将设备连接到地面,以便无法重新通电。如果没有电力,则没有电气损伤的风险。电气系统的分机正常确定系统清算程序所需的详细规划水平。复杂的配电系统可以将若干源具有若干源进入区域需要若干切换步骤来隔离系统的绝缘。有必要使用更精细的清算程序和与单线图一起使用系统的切换说明[1]。说明和/或程序应包括验证电源已被删除(通过实时线路测试或其他方式, )随后通过放置地面和隔离装置的锁定/标记[1]。在将所有人施加到配电系统的任何部分之前,应完全书写,检查和理解清算程序。本文认为该主题从欧洲和美国的角度来看。它调查了基本概念和定义,以突出运营债券并帮助程序项目。它提出了一些简单的规则,图形重构和电气状态的代数模型,以允许自动检查清算过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号