首页> 外文会议>International Joint Power Generation Conference and Exhibition >The economic analysis for No.2 steam turbine unit in YBS power plant
【24h】

The economic analysis for No.2 steam turbine unit in YBS power plant

机译:YBS发电厂2号汽轮机单元的经济学分析

获取原文

摘要

This article analysis the effects on heat rate and output power of No.2 generating unit in Yuanbaoshan power plant by some factors, such as equipment aging, reheater desuperheating water, circulating water flow, pressure drop through the reheater system, main operating parameters, etc. And give suggestion about improving the operating economic performance of the unit.
机译:本文分析了袁宝山发电厂No.2发电装置对袁宝山发电厂的热速率和输出功率的影响,如设备衰老,再热饮料水,循环水流,通过再热器系统,主要操作参数等,循环水流,压力下降。并提出提出提高单位经营经济绩效的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号