Power Plant Standardization Reduces Project Schedule and Plant Costs

机译:电厂标准化降低了项目时间表和工厂成本

获取原文

摘要

During recent years, the trend in the combined cycle power industry has continuously called for shorter cycles, earlier Commercial Operation Dates (CODs), lower Cost Of Electricity (COE) and increased availability and reliability. GE has responded to this trend by developing a standard power plant offering. The Standard Plant Offering is based on a highly pre-engineered modular plant concept and is the evolution of GE's reference plant concept, which was applied successfully during the last decade. The GE Standard Plant has its roots in the highly successful, reliable and daily start/stop capable 109FA Single-Shaft STAG Power Train, with more than 24 trains in operation globally and 12 more trains in construction across Europe and Asia. In order to satisfy the demand for accelerated plant construction cycles, the degree of pre-engineering in this pre-designed Power Island is 95% compared to 15% in the reference plant concept.
机译:近年来,联合循环电力行业的趋势已不断呼吁较短的循环,早期的商业运营日期(COD),较低的电力(COE)以及增加的可用性和可靠性。 GE通过开发标准电厂提供回应了这一趋势。标准工厂提供基于高度预先设计的模块化植物概念,是GE的参考工厂概念的演变,在过去十年中成功应用。 GE标准工厂在高度成功,可靠和每日开始/停止的109FA单轴雄鹿动力列车中有其根源,全球有超过24列车,欧洲和亚洲建设有12列车。为了满足加速植物建设周期的需求,该预先设计的电力岛的预工程程度为95%,而参考工厂概念为15%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号