首页> 外文会议>Power-Gen Europe >Economic evaluation criteria for project decisions: Finding the justified investment volume for additional output and efficiency
【24h】

Economic evaluation criteria for project decisions: Finding the justified investment volume for additional output and efficiency

机译:项目决策的经济评估标准:寻找合理的投资体积,以获得额外的产出和效率

获取原文

摘要

All power plant projects require an evaluation of both technical feasibility and economic benefits. The economic assessment of different options for a new power plant leads to the same considerations as upgrades or enhancements on existing plants, always coming down to a simple question: What is improved performance worth? In other words: to what extent can technical benefits justify increased investment that derive from: additional capacity (+ 1 MW), more availability (+100 OH), higher efficiency (+1%), shorter project lead time (-1 month), extended life time (+1 yr) or others.
机译:所有电厂项目都需要评估技术可行性和经济效益。对新电厂不同选择的经济评估导致现有植物的升级或增强相同的考虑因素,始终归结为一个简单的问题:什么是改进的表现?换句话说:技术效益可以在多大程度上证明来自以下的投资:额外的容量(+ 1 MW),更多可用性(+100 oh),更高的效率(+ 1%),更短的项目提供时间(-1个月) ,延长寿命(+1年)或其他人。

著录项

  • 来源
    《Power-Gen Europe》|2005年||共18页
  • 会议地点
  • 作者

    Robert Spemann;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类 TM6-53;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号