首页> 外文会议>International congress on earth science, exploration and mining around the pacific rim >Feasibility Studies, EPCM and the Environment-Case Studies in Integrated Mine Development
【24h】

Feasibility Studies, EPCM and the Environment-Case Studies in Integrated Mine Development

机译:可行性研究,EPCM和集成矿山发展的环境案例研究

获取原文

摘要

The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues are difficult to cotnrol with respect to the optimisation of operational environmental performance. This paper presents a standard mine development process with specific focus on environmental issues, and contrasts this against Rio Tinto's recent fast track experiences on the Hail Creek project (Australia), the Baranj project (India) and the Gokwe North project (Zimbabwe).
机译:快速跟踪的矿山开发战略试图将可行性研究和工程/调试函数融入流线型过程中。在这一压缩过程中,对运营环境绩效的优化难以进行环境问题。本文介绍了一个标准的矿山开发过程,特别关注环境问题,对抗RIO TINTO最近对Hail Creek项目(澳大利亚),Baranj项目(印度)和Gokwe North Project(津巴布韦)的快速跟踪体验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号