首页> 外文会议>International Congress on Earth Science, Exploration and Mining Around the Pacific Rim 10 - 13 October 1999 Bali, Indonesia >Feasibility Studies, EPCM and the Environment-Case Studies in Integrated Mine Development
【24h】

Feasibility Studies, EPCM and the Environment-Case Studies in Integrated Mine Development

机译:综合矿山开发中的可行性研究,EPCM和环境案例研究

获取原文
获取原文并翻译 | 示例

摘要

The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues are difficult to cotnrol with respect to the optimisation of operational environmental performance. This paper presents a standard mine development process with specific focus on environmental issues, and contrasts this against Rio Tinto's recent fast track experiences on the Hail Creek project (Australia), the Baranj project (India) and the Gokwe North project (Zimbabwe).
机译:快速跟踪的矿山开发策略试图将可行性研究和工程/调试功能融合到一个简化的过程中。在这种压缩过程中,就操作环境性能的优化而言,环境问题很难被重视。本文介绍了一个标准的矿山开发流程,特别关注环境问题,并将其与力拓最近在冰雹项目(澳大利亚),巴拉尼项目(印度)和戈克韦北部项目(津巴布韦)上的快速跟踪经验进行了对比。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号