A MULTISTAGE GENETIC ALGORITHM APPROACH FOR SOLVING RESOURCE CONSTRAINED MULTIPLE PROJECT SCHEDULING PROBLEMS WITH ALTERNATIVE PROJECTS

机译:一种多级遗传算法求解资源约束多个项目调度问题的替代项目

获取原文

摘要

In a multiple project environment, there also exists alternative ways for performing each project. This type of problem is called resource constrained multiple project scheduling problem with alternative projects (rc-mPSP/aP). The rc-mPSP/aP may be viewed as a network of projects which also involves project alternatives. In this research, we applied a monolithic approach which considers the alternative project selection and scheduling sub-problems together in a rc-mPSP/aP where the activity times alter during the scheduling period. The monolithic approach formulates the problem as an exclusive scheduling problem and tries to solve the rc-mPSP/aP. Particularly, a genetic algorithm (GA) approach was constructed in order to solving rc-mPSP/aP efficiently. Since there exist two sub-problems in rc-mPSP/aP, a multistage GA was created to reflect the sub-problems together in the exclusive problem. Finally, to evaluate the performance of the proposed monolithic multistage GA approach, various experiments were carried out on an example problem.
机译:在多个项目环境中,还存在执行每个项目的替代方法。这种类型的问题称为资源受限于替代项目(RC-MPSP / AP)的多个项目调度问题。 RC-MPSP / AP可以被视为项目网络,也涉及项目替代方案。在这项研究中,我们应用了一种单片方法,该方法将替代项目选择和调度子问题在RC-MPSP / AP中进行,其中活动时间在调度期间改变。单片方法将问题交流为独占调度问题,并试图解决RC-MPSP / AP。特别地,构建了遗传算法(GA)方法,以便有效地解决RC-MPSP / AP。由于RC-MPSP / AP中存在两个子问题,因此创建了多级GA以在独家问题中将子问题反映在一起。最后,为了评估所提出的单片多级GA方法的性能,对示例问题进行了各种实验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号