首页> 外文会议>International Conference on Energy and Environment >Aspects regarding the steam generator tube plugging at the support plate entrance using a high speed mechanical deformation procedure
【24h】

Aspects regarding the steam generator tube plugging at the support plate entrance using a high speed mechanical deformation procedure

机译:关于使用高速机械变形步骤在支撑板入口处堵塞蒸汽发生器管的方面

获取原文

摘要

The CANDU 6 NPP was designed to allow the post-decontamination evaluation of the steam generator tube wall thickness. It is conducted using Eddy currents while providing data regarding the defects' depth evolution, length and degradation volume, and also identifies new surface defects, while comparing them to the specified values. This article presents two tube plugging techniques using the same technique: plastic deformation by electrohydraulic shock based on the action of the pressure wave peak generated by a plasma stream created by the instant vaporization of a fuse and its surrounding water volume inside an enclosed chamber bounded by the expansion chamber walls. The process can be controlled by choosing the fuse and its discharge energy. Their implementation increases the life span of the connection; the first applied technique shortens the time of intervention by eliminating the lengthening of the tube mandrel inside the support plate.
机译:CANDU 6 NPP旨在允许蒸汽发生器管壁厚度的去污评估。使用涡流进行,同时提供有关缺陷的深度演化,长度和劣化体积的数据,并且还识别新的表面缺陷,同时将它们与指定值进行比较。本文呈现了同一技术的两个管堵塞技术:基于通过由熔断器内部蒸发而产生的等离子体流产生的等离子体流产生的压力波峰产生的动作来塑性变形。膨胀室墙壁。该过程可以通过选择保险丝及其放电能量来控制。他们的实现增加了连接的寿命;通过消除支撑板内的管心轴的延长,第一施加技术缩短了干预时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号