首页> 外文会议>Randol Gold Silver Forum >ADAPTIVE CONTROL IN PROCESSING GOLD ORE
【24h】

ADAPTIVE CONTROL IN PROCESSING GOLD ORE

机译:加工金矿的自适应控制

获取原文

摘要

An adaptive process control system was installed in Cortez Gold Mines Mill #2 Grinding Plant in Nevada. The installation, commissioning, and testing of the system took approximately 80 manweeks, but final test results show that the system paid for itself through increased throughput within two weeks of commissioning. Both crisp and fuzzy rules are used in the expert rule base which is also integrated with continually adapting neural network models. The expert rules and models are used by predictors, and optimizers to allow the control system to provide optimum process performance under continually varying feed conditions. The selection, installation, rule and predictor configuration, and statistically verifiable testing of the control system in the Cortez Gold Mines Mill #2 Grinding Plant is described in the paper.
机译:在内华达州的Cortez金矿厂研磨厂安装了自适应过程控制系统。系统的安装,调试和测试占据了大约80个曼周,但最终的测试结果表明,系统在调试后两周内通过增加吞吐量来自动支付。在专家规则库中使用了清晰和模糊规则,该规则也与连续调整神经网络模型集成。预测器和优化器使用专家规则和模型,以允许控制系统在不断变化的饲料条件下提供最佳的过程性能。本文描述了选择,安装,规则和预测仪配置,以及控制系统中控制系统的统计可验证测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号