首页> 外文会议>Randol Gold Silver Forum >COMMINUTION AT MT TODD
【24h】

COMMINUTION AT MT TODD

机译:在Mt Todd粉碎

获取原文

摘要

The Mt Todd Gold Mine Phase II Processing plant incorporates the most extensive use of Vertical Shaft Impactors for large scale processing that is in use currently within the world. The size and gold distributions resulting from the substantially abrasive action of the Barmac VSI units is unusual, and may allow improved leach recovery of the Batman ore. This is due to the liberation requirements of this ore, and the benefits associated with the preferential reduction of the gold containing components. Efficient screening to a 2.4 mm p80 product at production rates of around 100 t/hr/unit has been demonstrated with the Bivitec screen units from Binder & Co. The production of an essentially barren oversize reject stream from one of the screen oversize stream provides an opportunity to substantially decrease operating cost and / or improve gold recovery. The importance of these demonstrated effects during design of circuits for similar ores should not be underestimated and be included with any similar laboratory metallurgical testwork program, including pilot scale trials. Softer oxide type ores amenable to heap leaching, but with a fine liberation requirement, may be particularly suitable for this type of rushing flowsheet.
机译:MT Todd Gold Mine II II加工厂加工用于最广泛使用的垂直轴撞击仪,用于在世界范围内使用的大规模处理。由Barmac VSI单元的基本上磨蚀作用产生的尺寸和金分布是不寻常的,并且可以允许蝙蝠侠矿石的改善的浸出回收。这是由于该矿石的解放要求,以及与优先减少含金组分的益处。在BIVITEC屏幕单元中向2.4 mm P80产品的高效筛选到2.4 mm P80产品,BIVITEC屏幕单位来自BIDDER&Co.的生产基本上贫瘠的超大拒绝流来自其中一个屏幕超大流提供了一个机会显着降低运营成本和/或改善黄金恢复。这些证据在类似矿石电路设计期间的重要性不应低估,并被包括在任何类似的实验室冶金测试程序方案中,包括试验规模试验。较软的氧化物型矿石可享受堆浸出,但具有精细的解放要求,可能特别适用于这种冲击的流程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号