Operating experience for three-cylinder 700 MW steam turbine

机译:三缸700 MW汽轮机的操作经验

获取原文

摘要

In the view of stable power supply, high flexibility and high reliability are requisite conditions of the large steam turbine. Furthermore, turbines of an improved efficiency are required to protect global environment.Increase in steam temperature is an important factor in the improvement of turbine efficiency. And reduction of production cost is another important factor in recent years. A turbine must be a compact size even with large capacity.To meet these requirements, we developed a compact three-casing type 700 MW large capacity steam turbine which has a higher performance compared with conventional four-casing type turbine.This turbine was made for Reihoku Thermal Power Plant. The steam condition of the turbine is 24.1 Mpa (246 atg), 566/566°C. The turbine is a three-casing tandem compound type with titanium 40-inch last stage buckets. The rotational speed is 3600 rpm. TheHP and IP sections are built in a single casing using the counter flow arrangement to make the turbine compact.The turbine trial run, adjustment and test was completed successfully, and presently the turbine is operated commercially.This paper describes the structure of the steam turbine at the Reihoku Thermal Power Plant and its operating experience during the test operation.
机译:在稳定的电源的视图中,高柔韧性和高可靠性是大型汽轮机的必要条件。此外,需要提高效率的涡轮机来保护全局环境。蒸汽温度下降是涡轮机效率提高的重要因素。减少生产成本是近年来另一个重要因素。即使具有大容量,涡轮机必须是紧凑的尺寸。要满足这些要求,我们开发了一种紧凑的三套型700 MW大容量汽轮机,与传统的四套涡轮机相比具有更高的性能。这是制造的Reihoku火电厂。涡轮机的蒸汽条件为24.1MPa(246 ATG),566/566°C。涡轮机是一种三套串联化合物类型,钛40英寸最后一级桶。转速为3600rpm。 HP和IP部分采用逆流装置内置于单个套管中,以使涡轮机紧凑。涡轮试运行,调整和测试成功完成,目前涡轮机经运行。本文描述了汽轮机的结构在Reihoku火电厂及其在测试操作期间的运行经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号