Steam conditions for large-capacity fossil-fuel-burning thermal power plant in Japan have conventionally been24.1 MPa 538/566 deg C. Mitsubishi Heavy Industries, Ltd. (MHI)has, through wide-scale development programs, set techniques forsteam turbine design and materials at a high steam temperature andsteam conditions of 24.1 MPa and 593/593 deg C applied to large-capacity 1000 MW turbines, the Matsuura No.2 Unit for theElectric Power Development Co., Ltd. Based on our high-temperature design development, MHI has developed andmanufactured the 1000 MW turbine, Misumi No.1 Unit, forChugoku Electric Power Co., Inc., for the first time in the worldwith steam condition of 24.5 MPa and 600 deg C and a steamreheating temperature of 600 deg C. The first steam admission ofthis unit was completed in December 1997, and underwent testruns and other tests before starting commercial operation in June1998. This paper describes the design and operating features ofMisumi No.1 Unit.
机译:日本大容量化石燃料燃烧热电厂的蒸汽条件通常为24.1 MPa 538/566℃。三菱重工有限公司(MHI)通过大规模开发计划,为蒸汽轮机设置了技术适用于大容量1000 MW汽轮机的24.1 MPa和593/593℃蒸汽条件下的高温蒸汽条件下的设计和材料,基于电力公司高温设计的松浦第二机组在开发过程中,三菱重工首次为中国电力公司开发并制造了1000兆瓦涡轮机,Misumi No.1机组,蒸汽条件为24.5 MPa和600摄氏度,蒸汽再加热温度为600摄氏度。该装置的第一次蒸汽进入于1997年12月完成,并在1998年6月开始商业运行之前进行了试运行和其他测试。本文介绍了Misumi No.1单元的设计和操作功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号