首页> 外文会议>ASME International Mechanical Engineering Congress and Exposition >Exergy and Extended Exergy cost assessment of a commercial truck Ekaterina
【24h】

Exergy and Extended Exergy cost assessment of a commercial truck Ekaterina

机译:商用卡车Ekaterina的Deergy和扩展漏洞成本评估

获取原文

摘要

To gain a clearer understanding of the overall economic and environmental impact of the manufacturing process of a single vehicle, including its operational phase, it is useful to examine the process in a life-cycle perspective and with an exergy approach. The method of Extended Exergy Accounting (EEA) has already provided reliable results both for the assessment of entire countries and for the analysis of specific industrial sectors. National transportation sectors, generally reputed inefficient, have been the subject of a series of energy and exergy efficiency studies, though so far the phase of vehicle manufacturing was not specifically addressed. The present study is an attempt to quantitatively develop the complex evaluation of the exergy cost of a single vehicle, in particular of a commercial truck produced in the US (for which the available data are extensive and reliable). In the analysis performed in the course of this study, the last version of EEA has been employed, with the latest available data on the allocation coefficients for labour and capital cost factors. Particular attention is given to data selection and their processing. The values of the exergy costs for materials flows, energy inputs and of their equivalents for capital, labour and environment remediation are predicted. The results shows numerically the exergetic costs of economic, labour, material and energy inputs, and emphasize the further research of environmental remediation costs.
机译:为了更清楚地了解一辆车的制造过程的整体经济和环境影响,包括其运作阶段,在生命周期的角度和暴力方法中审查该过程是有用的。延长的Deergy会计(EEA)的方法已经提供了对整个国家的评估和对特定工业部门的分析的可靠结果。全国交通部门,一般效率低下,一直是一系列能源和高级效率研究的主题,但到目前为止,车辆制造的阶段没有明确解决。本研究是一种尝试,可以定量地发展对单一车辆的漏洞成本的复杂评估,特别是美国生产的商业卡车(可用数据广泛可靠)。在本研究过程中进行的分析中,已经采用了最后一个版本的EEA,最新的劳动力和资本成本因素的分配系数数据。特别注意数据选择及其处理。预测了材料流量,能源投入和其资本,劳动力和环境修复等同物的漏洞成本的价值。结果表明,经济,劳动力,材料和能源投入的举措,并强调了对环境修复成本的进一步研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号