首页> 外文会议>International symposium on safety and engineering aspects of spent fuel storage >A LIGHT WATER REACTOR SPENT FUEL RECEIVING AND STORAGE FACILITY UNDER CONSTRUCTION IN CHINA
【24h】

A LIGHT WATER REACTOR SPENT FUEL RECEIVING AND STORAGE FACILITY UNDER CONSTRUCTION IN CHINA

机译:在中国建设中的燃料接收和储存设施的轻型水反应器

获取原文

摘要

The paper describes the design and construction status of the first receiving and storage facility for LWR spent fuel in China. This facility is under construction and will service the reprocessing plant. The facility's technical and safety features are also described in detail. According to the general nuclear facility plan, this installation must go into operation before July 1997. The wet storage method, which technically is more mature internationally, will be adopted. The storage capacity is 1000 t U. It will receive the spent fuel assemblies discharged from the Day a Bay and Qinshan nuclear power plants. The design and critical analyses of safety are based on the parameters of the Daya Bay nuclear fuel. Ground was broken formally in April 1994 and this facility is now at the base digging stage. After the project is completed, it is expected to serve for 40 years.
机译:本文介绍了中国第一款收货和储存设施的设计和施工地位。该设施正在建设中,并将为再加工厂提供服务。还详细描述了设施的技术和安全功能。根据一般核设施计划,该安装必须在1997年7月之前进行运行。将采用技术上更加成熟的湿储存方法。存储容量为1000吨。它将收到从海湾和秦山核电站排出的花费燃料组件。安全的设计和批判分析是基于大田湾核燃料的参数。地面于1994年4月正式破坏,该设施现在处于基本挖掘阶段。项目完成后,预计将服务于40年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号