首页> 外文会议>International Conference on Contemporary Problems of Architecture and Construction >The Assessment of Construction Project Management Maturity Level in the Silesian Region in Poland
【24h】

The Assessment of Construction Project Management Maturity Level in the Silesian Region in Poland

机译:波兰西方地区建设项目管理成熟度评估

获取原文

摘要

Every construction investment is a project requiring close coordination, the freedom of access to the information, the application of special activity techniques and most of all the high level of maturity of construction project management. Findings of research conducted in different areas of project management confirm that the assurance of high level of project management maturity conditions the achievement of project's success. The higher level of maturity means the greater degree of capability to manage a construction project. The aim of the article is verification of the following hypotheses:
机译:每个建设投资都是一个需要密切协调的项目,获取信息自由,特殊活动技术的应用以及大部分建设项目管理的高度成熟度。项目管理不同领域进行的研究结果证实,保证了高水平的项目管理成熟度条件的成就。更高水平的成熟是指管理建筑项目的能力更大。文章的目的是验证以下假设:

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号