首页> 外文会议>International Conference on Applied Human Factors and Ergonomics >Understanding patterns of infrastructure development in the active war theater of Afghanistan over the period 2002-2010
【24h】

Understanding patterns of infrastructure development in the active war theater of Afghanistan over the period 2002-2010

机译:在2002 - 2010年期间了解阿富汗主动战区基础设施发展模式

获取原文

摘要

This study aims to review economic development throughout the war in Afghanistan by representing the total number of economic improvement projects and their respective total budgets within the active war theater of Afghanistan, over the period of 2002-2010. Data used for this study includes eleven infrastructure development projects that took place between 2002 and 2010 in Afghanistan. The total number of economic improvement projects, as well as the total budget of those projects, have been used for understanding patterns of infrastructure development in Afghanistan. The country was divided into seven regions for pattern analysis, where each region consists of various numbers of provinces, districts, and records. Based on the results obtained, it was concluded that the total number of economic improvement projects were at their lowest in 2002 and at their highest in 2007. When the regions were compared, the central region had the highest number of economic improvement projects, whereas the south-western region had the lowest number of economic improvement projects. Project-type analyses revealed that water supply and sanitation projects were most numerous, while agriculture projects were least numerous. Considering the total budget of economic improvement projects, the north-eastern region had the highest total budget ($177.5 million) and the south-eastern region had the lowest total budget ($95.6 million). The combined total budget of transport-type projects had the highest total value ($366.2 million) amongst project types, while agriculture projects had the lowest combined total budget ($2.6 million). Understanding these patterns may provide useful information about strategies and tactics to be employed for similar scenarios in an active war theater in the future.
机译:本研究旨在通过代表2002 - 2010年期间的经济改善项目总数及其在阿富汗的主动战争剧院内的经济改善项目总数及其各自的预算,审查了经济发展。用于本研究的数据包括在阿富汗2002年至2010年之间发生的十一步基础设施开发项目。经济改善项目的总数以及这些项目的总预算,已被用于理解阿富汗基础设施发展模式。该国分为七个模式分析区域,每个地区都包括各种省份,地区和记录。基于所得的结果,得出结论是,经济改善项目总数在2002年最低,在2007年最高。当该地区进行比较时,中部地区的经济改善项目数量最多,而且西南地区经济改善项目数量最低。项目型分析显示,供水和卫生项目最多,而农业项目最少众多。考虑到经济改善项目的总预算,东北地区的总预算总额(1.775亿美元),东南部地区总预算总额(9560万美元)。运输型项目的总预算总值最高(项目类型)的总价值(366.2百万美元),而农业项目的总预算总额(260万美元)。了解这些模式可以提供有关在未来主动战区中使用类似场景的策略和战术的有用信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号