首页> 外文会议>International Conference on Material Engineering and Application >A Study of the Inspection of In-Service Pile Foundation Bearing Capacity at High-Piled Wharf
【24h】

A Study of the Inspection of In-Service Pile Foundation Bearing Capacity at High-Piled Wharf

机译:高桩码头役桩基础承载力检验研究

获取原文

摘要

In order to adapt to the production demand, it is planned to upgrade the berths of high-piled wharf upper structure of which is severely damaged and adopt static load test to check if the bearing capacity of steel pipes in original structure can reach 6,000kN as required for use in newly built structure and economic and reliable purposes.
机译:为了适应生产需求,计划升级高桩码头上部结构的泊位,这是严重损坏和采用静态载荷试验,以检查原始结构中钢管的承载力是否可达6,000kn在新建结构和经济可靠的目的中使用所需的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号