首页> 外文会议>International Conference on Civil Engineering and Materials Science >Design and construction monitoring and deformation analysis of super-large deep foundation pit
【24h】

Design and construction monitoring and deformation analysis of super-large deep foundation pit

机译:超大型深基坑的设计与施工监测与变形分析

获取原文

摘要

Using the large and deep foundation pit of Metro Line 1 of Jinan west railway station as an example,this paper elaborated the design scheme of its retaining structure,formulated a monitoring scheme for foundation pit.In addition,through the real-time on-scene monitoring of horizontal displacement of pile top and pile body,and the monitoring data,we found the law of displacement of deep foundation pit supporting structure.The maximum horizontal displacement of pile body moves down gradually with the advancement of excavation support and the main construction.The maximum displacement occurs around 0.684H.This study has implications for similar engineering geological conditions of foundation pit supporting structure.
机译:利用济南西火车站地铁1号线的大和深基坑为例,本文阐述了其保留结构的设计方案,制定了基础坑的监测方案。此外,通过实时现场的实时监测桩顶部和桩机的水平位移,以及监测数据,我们发现了深基坑支撑结构的位移定律。桩机的最大水平位移随着挖掘支撑的推进和主要建设的推进而下降。最大位移发生约0.684小时。该研究对基础坑支撑结构的类似工程地质条件有影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号