首页> 外文会议>IEEE International Conference on Environment and Electrical Engineering >Improve Capacity Utilization of Substation Transformers via Distribution Network Reconflguraion and Load Transfer
【24h】

Improve Capacity Utilization of Substation Transformers via Distribution Network Reconflguraion and Load Transfer

机译:通过分配网络侦察和负载转移提高变电站变压器的能力利用

获取原文

摘要

Nowadays, the essentiality of asset management in power systems and higher utilization of resources have become more critical to keep pace with the radically growing demand of today's networks. Power transformers are amongst the most important equipments installed in power distribution systems. Therefore, this paper presents a novel methodology to improve the utilization of substation transformers. In this methodology, the transformer utilization of a two-transformer substation is increased via reconfiguration considering the single contingency policy (SCP). The online reconfiguration helps to maximize the amount of load transferred from a substation with a failed transformer to its neighboring substation. This load transfer maximization provides higher transformer capacity utilization possible. In the presented methodology, the load transfer is optimized through two hierarchical stages. In the first stage, the best configuration of the assisting substation is achieved. Then, in the second stage, load points that can be transferred from the substation with a failed transformer to its neighboring healthy substation are determined. In both of the stages, the reconfiguration problem is modeled as a mixed integer second-order cone programming problem. The IEEE 33 bus distribution network is considered as the test system and the results illustrate the effectiveness of the proposed methodology in transformer utilization improvement.
机译:如今,电力系统资产管理的基本性和资源利用率更高的利用使得与当今网络的彻底增长的需求保持速度变得更加重要。电力变压器是配电系统中安装的最重要的设备之一。因此,本文提出了一种改进变电站变压器利用的新方法。在该方法中,考虑单个应急策略(SCP),通过重新配置来增加双变电站的变压器利用。在线重新配置有助于最大化从变电站传输的负载量,以失败的变压器到其相邻变电站。这种负载传输最大化提供了更高的变压器容量利用。在呈现的方法中,负载传输通过两个层级优化。在第一阶段,实现了辅助变电站的最佳配置。然后,在第二阶段,确定可以从变电站与变电站转移到其相邻的健康变电站的变电站的负载点。在两个阶段中,重新配置问题被建模为混合整数二阶锥编程问题。 IEEE 33总线分配网络被认为是测试系统,结果说明了所提出的方法在变压器利用改进中的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号