首页> 外文会议>International Seminar on Industrial Engineering and Management >Integer Linear Programming Model and Algorithm to Integrate Heuristics Scheduling EDD, Inventory Control and Distribution Problems in a Modular Production System
【24h】

Integer Linear Programming Model and Algorithm to Integrate Heuristics Scheduling EDD, Inventory Control and Distribution Problems in a Modular Production System

机译:整数线性规划模型和算法在模块化生产系统中集成了启发式调度EDD,库存控制和分布问题

获取原文
获取外文期刊封面目录资料

摘要

In this paper, a two-stage algorithm developed for the cutting sequencing problem in a modular manufacturing system. This system has a level of flexibility depends on the cutting stage of raw material. This paper focuses primarily on the work station. In the first stage of the algorithm, an integer linear programming model is used to determine the number of hardboards that will be cut. The model was tested with two different objective function is to minimize waste and to minimize the number of hardboards used. In the second stage, a heuristic developed a scheduling pattern of cutting, where the due date and the number of requests demand a consideration. This algorithm is further implemented in a furniture manufacturer that operates using the make-to-order basis.
机译:本文,在模块化制造系统中为切割测序问题开发了一种两级算法。该系统具有灵活性水平取决于原料的切割阶段。本文主要侧重于工作站。在算法的第一阶段中,使用整数线性编程模型来确定将切割的硬盘的数量。使用两种不同的目标函数测试模型是最小化浪费,并最大限度地减少使用的硬盘数量。在第二阶段,启发式开发了一种调度模式,其中截止日期和请求的数量要求考虑。该算法在家具制造商中进一步实现,该制造商使用按订单运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号