首页> 外文会议>International Conference on Sustainable Energy and Environmental Engineering >Study on the Terminal Line Reasonable Position of Two Coal Seam under the Down-protective Layer Pressure-relieved Mining
【24h】

Study on the Terminal Line Reasonable Position of Two Coal Seam under the Down-protective Layer Pressure-relieved Mining

机译:下防护层压力缓解矿井两种煤层终端线合理位置研究

获取原文

摘要

In order to study the stress distribution and its dynamic influence law while the protective layer mining, based on the transfer law of mining-induced stress in the coal seam floor and in front of the working face, using numerical simulation software to simulate the surrounding rock stress under the different pillar width mining conditions, and carried through the roadway deformation engineering practice observations. It is shown that reserved 110m coal pillar could weaken the impact on the front of the floor tunnel under the protective layer mining process. When the top liberated layer mining to reduce the impact of mining stress superposition, it should avoid the terminal lines on the two coal seams at the same location and may be staggered at least about 30m ~ 50m. And it obtained that the roadway deformation not only by mining impact, but also considering the geological environment surrounding rock conditions, tunnel position in which layers of rock, rock properties and other factors. The research guided the engineering practice successfully.
机译:为了研究压力分布及其动态影响法,而保护层采矿的同时,基于煤层地板和工作面前的采矿诱导应力的转移规律,使用数值模拟软件模拟周围岩石在不同的支柱宽度采矿条件下应力,并通过道路变形工程实践观测。结果表明,保留的110米煤柱可以在保护层采矿过程下削弱地板隧道前部的冲击。当顶部解放的层挖掘以减少采矿应力叠加的影响时,它应该避免在同一位置的两个煤层上的终端线,并且可能交错至少约30m〜50m。并且它不仅通过采矿影响而变形,而且还考虑了岩石条件的地质环境,隧道位置,其中岩石,岩石属性等因素。该研究成功引导了工程实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号