首页> 外文会议>International Conference on Industrial and Manufacturing Engineering >SUPPLIER SELECTION USING FUZZY ANALYTIC NETWORK PROCESS (FANP) AT PT PUTRA GUNUNG KIDUL
【24h】

SUPPLIER SELECTION USING FUZZY ANALYTIC NETWORK PROCESS (FANP) AT PT PUTRA GUNUNG KIDUL

机译:在PT Putra Gunung Kidul使用模糊分析网络过程(FANP)的供应商选择

获取原文

摘要

Supplier selection is very important in the purchase of raw materials that require a good cooperative relationship between the supplier and the company. The interaction between the company and the supplier is required to ensure the availability of raw materials needed in the production process. PT Putra Gunung Kidul is a company that produces noodles. The problems that occurred in PT Putra Gunung Kidul is the order delivery of raw materials from suppliers that do not fit the schedule so that a delay in delivery so that production companies to be blocked. Objectives to be achieved in this study, the first objective is to determine the criteria most influential in the choice of supplier PT Putra Gunung Kidul and determine the best suppliers based on the results of ranking supplier using Fuzzy Analytic Network Process (FANP). FANP calculations done using pairwise comparison matrix pairs of the five criteria, 16 sub-criteria, as well as three alternative suppliers in order to obtain the weight of each criteria, sub-criteria and alternatives. Based on calculations of the most influential criterion is quality with a weight of 0.24686. Subcriteria most influential of weighting results based on the criteria of the most influential is the ability to deliver consistent quality (Q2) of 0.094531. Best Supplier in supplying raw materials to PT Putra Gunung Kidul based on the ranking and the greatest weight is PT B is at the first place with a weight of 0.137086, PT C ranks second with a weight of 0.079240, and PT A ranks third with a weight of 0.062575.
机译:供应商的选择在购买提供者和公司之间需要良好合作关系的原材料方面非常重要。公司和供应商之间的互动是必需的,以确保生产过程所需的原材料。 PT Putra Gunung Bidul是一家生产面条的公司。 PT Putra Gunung Bidul中发生的问题是来自不适合该时间表的供应商的原材料订单交付,以便延迟交付,使生产公司被阻止。在本研究中实现的目标,第一个目标是确定在选择供应商PT Putra Gunung绑架中最有影响力的标准,并根据使用模糊分析网络过程(FANP)的排名结果确定最佳供应商。 FANP计算使用五个标准,16个子标准以及三个替代供应商的成对比较矩阵对进行完成,以获得每个标准,子标准和替代方案的重量。基于最有影响力标准的计算是重量为0.24686的质量。基于最具影响力的标准的加权结果最有影响力的亚奇提是能够提供0.094531的一致质量(Q2)。最佳供应商在基于排名和最大重量的基础上向PT Putra Gunung绑架提供原料的最佳供应商是重量为0.137086的第一个,PT C排名第二,重量为0.079240,而Pt a排名第三重量为0.062575。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号