首页> 外文会议>ALTA Annual Conference >FIRST COMMERCIALISATION OF THE ALBION PROCESS~(TM) FOR COPPER
【24h】

FIRST COMMERCIALISATION OF THE ALBION PROCESS~(TM) FOR COPPER

机译:首先商业化铜的算法〜(tm)

获取原文

摘要

Sable Zinc Kabwe Limited ("Sable") is a base metal processing plant two kilometres south of Kabwe Town in Central Province, Zambia. The region has a rich history in mining and minerals production, being a major lead and zinc producer from the 1900's up to the mid-1990s. In 2006, a copper plant was built at the Sable processing site to treat third-party copper and cobalt oxide ores and concentrates. The oxide leaching plant included whole ore leaching, solvent extraction and production of 8,000 tpa LME Grade A copper cathode. The plant was placed on care and maintenance in 2014, and Glencore Pic ("Glencore") took the opportunity to convert the plant using a minimal budget, to an Albion Process~(TM) plant to treat local refractory copper concentrates unsuitable or uneconomic for smelting. The Albion Process~(TM) plant comprises an M100 IsaMill~(TM) operating in acidic conditions such that raffinate from the downstream process is recycled back to slurry the concentrate delivered to site thus maximising copper tenor in solution and reducing water consumption. The finely ground concentrate feeds an oxidative leaching plant using the existing stainless steel oxide leach reactors converted to Albion Process~(TM) duty by fitting HyperSparge~(TM) supersonic oxygen injectors and gas dispersing agitators. The leached slurry is then directed to the existing solid/liquid separation equipment and the PLS is then sent to the existing SX/EW plant. The plant also allows for cobalt recovery from the raffinate. The plant was designed based on testwork on regional copper concentrates. The plant was designed to toll treat a range of concentrates and so the design was flexible with the flexibility of the Albion Process~(TM) being one of its distinct advantages, the plant was ideally suited for tolling regional concentrates. The plant was commissioned and ramped up in six weeks using low grade Zambian copper concentrate, and produced exclusively LME Grade A copper with over 99% leach recovery in the Albion Process~(TM) circuit.
机译:Sable Zinc Kabwe Limited(“莎莱”)是一家基础金属加工厂,在赞比亚中央省中央省的Kabwe镇南部两公里。该地区在采矿和矿物生产中具有丰富的历史,是1900年代中期的主要领先领域和锌生产商,直至20世纪90年代中期。 2006年,铜厂建于甲型加工部位,以治疗第三方铜和氧化钴矿石和浓缩物。氧化物浸出厂包括整个矿石浸出,溶剂萃取和生产8,000dpa LME级铜阴极。该植物于2014年置于护理和维护,并在Glencore Pic(“Glencore”)借此机会使用最小预算将植物转换为算法〜(TM)工厂治疗当地耐火铜浓缩物不适合或不经济冶炼。 Albion方法〜(TM)植物包含在酸性条件下操作的M100 Isamill〜(TM),使得从下游过程中的萃余液再循环回落浆料,使浓缩物递送到现场,从而最大化溶液中的铜更高,降低含水量并降低液体消耗。通过拟合超级〜(TM)超声氧气注射器和气体分散搅拌器,使用将现有的不锈钢氧化物浸出反应器喂养氧化浸出植物氧化浸出植物〜(TM)占用。然后将浸出的浆料引导到现有的固体/液体分离设备,然后将PLS发送到现有的SX / EW工厂。该植物还允许从萃余液中升钴。该植物是基于区域铜浓缩物的验证而设计的。该植物设计用于治疗一系列浓缩物,因此设计灵活性,随着Albion过程的灵活性〜(TM)是其独特优势之一,该植物非常适合涉及令止血的区域浓缩物。使用低级Zambian铜浓缩物六周委托和升级,并在血液中产生了LME级铜,在汉代工艺〜(TM)电路中具有超过99%的乳胶恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号