CENTRAL JORDAN URANIUM PROJECT: MONITORING THE PROJECT MATURITY VIA THE APPLICATION OF THE UNFC-2009

机译:中央约旦铀项目:通过UNFC-2009的应用监测项目成熟度

获取原文

摘要

The uranium deposits in the Central Jordan Uranium Project (CJUP) are primarily hosted by the Muaqar Chalky Marl (MCM) Formation of upper Maastrichtian age, part of the Upper Cretaceous to lower Tertiary Belqa Group. Uranium exploration and resource estimation were performed over three phases in this project: phase I (2009 - 2014), phase II (2016) and phase III (2018 to current). JORC-2012 standards have been adopted and followed to carry over all exploration activities and resource estimation stages; from Inferred to the measured category. Metallurgical testwork indicated the amenability of the ore to static leaching using alkaline lixiviants. However other metal extraction routes, including various physical beneficiation processing concepts, were investigated. Initial results, with a fourfold concentration upgrade, were encouraging but a preliminary engineering and economic trade off analysis indicated the whole of ore concept as the preferred option. Therefore, higher level process development and engineering endeavors are currently culminating into the construction of a processing pilot plant based on heap leach technology. The data generated from the pilot plant operation will provide the basis for commercial plant detailed engineering and project feasibility analysis. This study demonstrates the advantages of using the UNFC-2009 classification system to monitor the project maturity of CJUP over different phases of exploration and technical viability. The project progressed from a "Potentially Commercial Projects/Development on Hold" project in Phase I to a more mature "Potentially Commercial Projects/Development Pending" in Phase II. Phase III is still progressing. The application of UNFC-2009 to the CJUP study in Jordan clearly demonstrates the advantage of tracking the project from a lower maturity level of assessment to a higher level. Therefore, classification and reporting of uranium project results using UNFC-2009 have clear advantages for policy makers in Jordan, as well as for internal company requirements for monitoring the progress of a project over time.
机译:中央约旦铀矿(CJUP)的铀矿地主主要由Muaqar Chalky Marl(MCM)形成上马斯特里安年龄的地层,其上白垩纪的一部分降低的贝拉卡集团。本项目三个阶段进行铀勘探和资源估计:第一阶段(2009 - 2014),第二阶段(2016年)和第三阶段(2018年至今)。 JORC-2012标准已采纳并遵循所有勘探活动和资源估算阶段;从推断给测量的类别。冶金验证表明矿石的易于使用碱性LixiaInts静态浸出。然而,研究了其他金属提取路线,包括各种物理受益加工概念。初步结果,具有四倍浓度升级,令人鼓舞,但初步工程和经济贸易差异分析表明整个矿石概念作为首选选择。因此,较高水平的过程开发和工程努力目前目前基于堆浸出技术的加工试验工厂的建设。试点工厂运营产生的数据将提供商业厂的详细工程和项目可行性分析的基础。本研究展示了使用FOVE-2009分类系统的优点,以监测CJUP的项目成熟度,在不同的勘探和技术可行性阶段。该项目在I阶段从“潜在的商业项目/发展持有”项目中进入了II期的更成熟“潜在的商业项目/发展”。 III阶段仍在进行。 UNFC-2009在约旦的CJUP学习中的应用清楚地表明,从较低的成熟程度跟踪项目的优势,对评估的较低程度。因此,使用FOVC-2009的铀项目结果的分类和报告在约旦的决策者以及内部公司随着时间的推移监测项目进展的要求以及内部公司的要求以及内部公司的优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号