Lowering Capital Costs when Evaluating Relief Systems - A Collaborative Approach

机译:评估救济系统时降低资本成本 - 一种协作方法

获取原文

摘要

Continued uncertainty in future oil and gas prices has increased the sensitivity around energy related developments, leading to elevated levels of financial scrutiny. This is making owner-operators and Engineering, Procurement, and Construction (EPC) companies continue to look for smart options to increase their overall project delivery performance in order to maximize the Net Present Value (NPV). Lowering cost of design calls for a more collaborative approach to ensure an effective and prudent design of relief systems. The design of relief systems requires much more than just the proper sizing of the relief devices. During the concept phase of either Greenfield or Brownfield projects, assessing the basis for major relief systems and making clear recommendations to reduce the risks associated with each system has helped companies realize substantial safety and economic benefits. This presentation will give a typical breakdown of the collaborative workflow process for each of the entities involved in the project. Four distinct work activities are typically identified for such a project - development of preliminary overpressure protection, engineering design of relief systems, validation of the design, and validation of as-built documentation. At the end of each stage, the output from the independent analysis is compared with the contractor's work and updates are performed before continuing to the next stage. This presentation will also give an overview of these stages, discuss the various steps, and the value-added benefit for each stage of the project.
机译:未来石油和天然气价格的持续不确定性增加了能源相关发展的敏感性,导致金融审查水平提高。这使得所有者 - 运营商和工程,采购和建筑(EPC)公司继续寻求智能选择以提高其整体项目的交付性能,以最大限度地提高净现值(NPV)。降低设计成本要求更加合作的方法,以确保有效和谨慎的浮雕设计。浮雕系统的设计需要不仅仅是释放设备的适当尺寸。在格林菲尔德或布朗菲尔德项目的概念阶段,评估主要救济系统的基础,并清楚的建议减少与每个系统相关的风险有助于公司实现了大量的安全和经济效益。此演示文稿将为项目中涉及的每个实体提供协作工作流程的典型故障。通常确定了四项不同的工作活动,以获得初步过压保护,工程设计,救济系统的工程设计,设计的验证以及构建文档的验证。在每个阶段结束时,与承包商的工作相比,从独立分析的输出相比,在继续下一个阶段之前执行更新。本演示文稿还将概述这些阶段,讨论各种步骤,以及项目每个阶段的增值效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号