首页> 外文会议>Annual Conference on Deep Foundations >FOUNDATION DESIGN AND CONSTRUCTION CHALLENGES WITH MARSH DEPOSITS IN A HIGH SEISMIC RISK ZONE
【24h】

FOUNDATION DESIGN AND CONSTRUCTION CHALLENGES WITH MARSH DEPOSITS IN A HIGH SEISMIC RISK ZONE

机译:高地震风险区中沼泽矿床的基础设计与施工挑战

获取原文

摘要

Driven piles are a common tool in any engineer’s toolbox for supporting large structures oververy soft ground, especially in high seismic risk zones. Challenges include achieving sufficientvertical and lateral load capacities within the constraints of pile spacing and geologic conditions.This was the case for a project in Orange County, California with a state-of-the-art, $180 millionplant for biosolids processing, biogas management and energy recovery located in marshlandnext to an existing waste water treatment plant. The new construction for the Irvine RanchWater District included a 70-foot (21 m) tall building and three closely spaced, 90-foot (27 m)high, 65-foot (20 m) diameter, egg-shaped steel digester tanks. The lower 35-feet (11 m) of thetanks were constructed below ground level.
机译:驱动的桩是任何工程师工具箱中的常用工具,用于支持大型结构非常柔软的地面,尤其是高地震风险区域。挑战包括实现足够的桩间距和地质条件约束中的垂直和横向负载能力。这是加利福尼亚州Orange County的项目的情况,拥有最先进的,1.8亿美元生物糖类加工植物,位于沼泽地的沼气管理和能源回收在现有的废水处理厂旁边。欧维海牧场的新建筑水区包括70英尺高的建筑,三个紧密间隔,90英尺(27米)高,65英尺(20米)直径,蛋形钢消化罐。较低的35英尺(11米)坦克在地面水平以下。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号