首页> 外文会议>ISPE Inc. International Conference on Transdisciplinary Engineering >Systems Evaluation Methodology to Attend the Digital Projects Requirements for Industry 4.0
【24h】

Systems Evaluation Methodology to Attend the Digital Projects Requirements for Industry 4.0

机译:系统评估方法参加工业4.0的数字项目要求

获取原文

摘要

Large corporations work with legacy systems to standardize the execution of activities, support, data formatting and communication between different sites around the world. However, some companies in certain countries have been unable to integrate these systems due to a number of factors involving cultural aspects, local legislation and infrastructure. With the arrival of the Fourth Industrial Revolution, also known as Industry 4.0, there is a need to deploy digital projects that have a dependency relationship with legacy systems in acquiring and managing information making it more accessible to the user. In addition, this integration needs to be synchronized with other countries so as not to lead to uneven maturity among organizations, leading to difficulties in adopting I4.0 in different plants around the world. The objective of this article is to elaborate an evaluation methodology between legacy and local systems, using multi-criteria decision-making methods (MCDM/A), in order to verify if both attend the specifications of the organization's digital transformation projects. As a way to evaluate the proposed model was used the case of an automotive company located in Brazil for more than 20 years that has one of its units in South America (Colombia) with local systems that are bringing numerous difficulties of implementation of projects geared to I4.0. With the support of the MCDM/A methods, it was noticed that some local systems would be able to attend the scope of the projects since it would allow a flexibilization to customize certain points of integration.
机译:大型公司与遗留系统合作,以规范世界各地不同地点之间的活动,支持,数据格式和沟通的执行。然而,由于一些涉及文化方面,地方立法和基础设施的因素,某些国家的一些公司无法整合这些系统。随着第四次工业革命的到来,也称为行业4.0,需要部署具有与遗留系统的依赖关系的数字项目,以获取和管理信息,使得用户更可访问。此外,这种整合需要与其他国家同步,以免在组织之间导致不均匀的成熟,导致在世界各地的不同植物中采用I4.0难以困难。本文的目的是利用多标准决策方法(MCDM / A)来详细说明遗留和本地系统之间的评估方法,以便验证是否两者是否参加组织的数字转型项目的规范。作为评估拟议模型的方式,使用了位于巴西的汽车公司的案例超过20年,其中拥有其在南美洲(哥伦比亚)中的一个单位,其中包括当地系统,这些系统带来了众多难以实施的项目I4.0。通过支持MCDM /一种方法,注意到一些本地系统能够参加项目的范围,因为它将允许灵活性定制某些集成点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号