The abstract: In a power plant in China, two shield tunnels including east line and west line were planned to construct for circulating cooling water under the Yangtze River. During the construction of the east line, a collapse occurred which destroyed the tunnel section originally designed for intakes. Decision was made to abandon the collapsed section of the tunnel and the intakes would be built in the adjacent section of the tunnel that remained intact. Unlike conventional intake construction technology scheme of jacking the intake pipes from the tunnel inside vertically upward to the river, the new scheme was adopted to install the intakes from the river surface down to the inside of tunnel. Artificial ground freezing (AGF) method was firstly applied to provide a safety condition of intake installing construction, which played a role of water sealing and soil reinforcing. A freezing and monitoring system had been set up on the working platform above river to control and monitor the temperature of the soil around the intakes to realize the engineering reliability. This paper describes the technique of AGF and the intake installation procedure of this project, briefly analyzing the temperature field of frozen soil around intakes. The result show that the development of frozen curtain is under control and AGF was successfully applied to the intake installing construction of this underwater project with a favorable effect. The engineering application might be important for reference in other underwater tunnel projects.
机译:摘要:在中国的电厂,计划在包括东线和西线的两个盾牌隧道,以构建长江下的循环冷却水。在建造东线期间,发生了崩溃,摧毁了最初为摄入量设计的隧道部分。决定放弃隧道的折叠部分,摄入量将内置在隧道的相邻部分保持完整。与传统的进气施工技术方案不同,从垂直向上向河流上的隧道中的进气管,采用新方案将从河流面向隧道内部安装进口。首先应用人工冻结(AGF)方法以提供一种进气装置的安全性,这起到了水密封和土壤增强的作用。在河上方的工作平台上设置了一个冻结和监测系统,以控制和监测摄入量周围的土壤的温度,以实现工程可靠性。本文介绍了AGF的技术和该项目的进气安装程序,简要介绍了摄入量的冷冻土的温度场。结果表明,冷冻窗帘的发展受到控制,AGF成功应用于该水下项目的进气,具有良好的效果。工程应用在其他水下隧道项目中可能是重要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号