Coal ash disposition facility by using geotextile tubes

机译:采用土工织物管煤灰处理设施

获取原文

摘要

The present article describes the designing works, field tests, execution and rising of a tailing cell for ashes originated in the process of a thermoelectric power plant located in the northeast region of Brazil. These tailings are resulting from mineral coal burn in the process of electrical energy generation. Previously these tailings were disposed in a conventional tailing cell, but, according to operation previsions in the power plant, this cell would get insufficient by the year of 2012. The proposed solution was the use of geotextile tubes filled with the own tailings generated in the plant process, using them to rise the tailing cell capacity without the need of an increased area to do so. In the year 2013 the project design got completed and two rising lines of geotextile tubes were defined as the better combination for the whole conditions, as a result, a higher tailings dam, rising 3 meters, attended the plant needs. Since this kind of tailings are not usually managed as slurry, many other conditions of installation and operation for the geotextile tubes were defined on site and on laboratory, making this project a very innovative one. As the ashes correspond to a dry material with difficult manipulation characteristics, resulted to be very challenging to the responsible technical team, demanding the realization of several tests and measurements. The viability of the proposed solution got verified and approved for further projects in the same field. The installation process of the geotextile tubes began in December of 2013. As seen through the performed tests, the solution was a success, showing itself as both efficient and safe, besides the technical, economical and operational advantages achieved in comparison to the conventional solutions.
机译:本文介绍了灰烬尾矿电池的设计作品,现场测试,执行和上升,该钻孔源于位于巴西东北地区的热电发电厂的过程中。这些尾矿是由矿煤燃烧在电能产生过程中产生的。以前以前这些尾矿设置在传统的尾矿单元中,但是,根据电厂的操作预防,该电池将在2012年的年度下降。所提出的解决方案是使用填充有自己尾矿的土工织物管。植物过程,使用它们上升拖尾电池容量,而不需要增加区域。 2013年,项目设计已完成,两条上升的土工织物管道被定义为整体条件的更好组合,结果,尾矿坝升高3米,参加了植物需求。由于这种尾矿通常不作为浆料管理,因此在现场和实验室上定义了许多其他安装和工地操作的条件,并在实验室中定义了这一项目非常创新的。由于灰烬对应于具有难以操纵特性的干燥材料,因此对负责任的技术团队来说是非常挑战,要求实现几种测试和测量。拟议解决方案的可行性得到了同一领域的进一步项目的核实和批准。土工织物管的安装过程于2013年12月开始。如通过执行的测试所见,除了与传统解决方案相比,除了与传统解决方案相比的技术,经济和操作优势之外,该解决方案均为高效和安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号