首页> 外文会议>International Conference on Mining and Metallurgy >LONG-TERM DEVELOPMENT PLANNING OF THE LIMESTONE OPEN PIT 'COKOCE' WHICH OPERATES WITHIN THE COMPANY HOLCIM SERBIA DOO
【24h】

LONG-TERM DEVELOPMENT PLANNING OF THE LIMESTONE OPEN PIT 'COKOCE' WHICH OPERATES WITHIN THE COMPANY HOLCIM SERBIA DOO

机译:Limestone露天坑的长期发展规划“Cokoce”,该公司在Holcim Serbia Doo公司内运营

获取原文

摘要

The paper presents a long-term development of the limestone open pit Cokoce which operates within the company Holcim Serbia doo. The application of the software Whittle for strategic planning and optimization the excavation limit and software Genicom for construction the open pits has defined the open pit development depending on the production capacity of cement clinker, the quality of mineral resources in terms of CaO, MgO, Al_2O_3, SiO_2, Fe_2O_3 content and achievement maximum profit in this production process.
机译:本文介绍了石灰石露天坑的长期发展,该公司在Holcim Serbia Doo公司内运营。应用软件的应用削减战略规划和优化的挖掘极限和软件遗传算法的开放式坑段根据水泥熟料的生产能力,矿物资源质量,曹,MgO,AL_2O_3的生产能力定义了开放式坑开发。 ,SiO_2,FE_2O_3内容和成就在此生产过程中的最大利润。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号