DESIGN, CONSTRUCTION AND START-UP OF THE ILO SMELTER MODERNIZATION PROJECT

机译:国际劳工组织冶炼厂现代化项目的设计,建设和启动

获取原文

摘要

Southern Copper Corporation (SCC) is one of the world's largest copper companies and is finishing the modernization of the llo copper smelter. A single ISASMELT? furnace will start smelting 1,200,000 tons per year of concentrate at the end of 2006. Three existing Peirce Smith converters are being upgraded plus a new one for converting the matte to blister copper is being installed. Two new anode furnaces and a twin anode casting wheel have being operating since January 2006. This represents one of the main changes in the process because the final product of the smelter is now anode copper instead of blister copper. A new oxygen plant, acid plant, and others facilities are in the ramp-up stage. This environmental project will ensure that the new smelter will comply with the environmental regulations of Peru by the end of January 2007. This paper summarizes the background to the modernization project, describes the different stages of the project including engineering, procurement and construction, describes the main areas of the new copper smelter and also the pre-operational testing, commissioning and start-up of them. This is a brown field project with a target of reducing as much as possible the production losses of the existing operation. This paper presents the details of the development of the llo Smelter Modernization Project and explains the main aspects of the new facilities, the products to be obtained and the associated facilities for their commercialization, including a Marine Trestle for bulk acid exportation.
机译:南方铜公司(SCC)是世界上最大的铜公司之一,正在完成LLO铜冶炼厂的现代化。单身isasmelt? 2006年底,炉子将每年开始冶炼120万吨的浓缩物。正在安装三个现有的Peirce Smith转换器加上一个新的,用于将遮罩转换为泡罩铜的新型。自2006年1月以来,两个新的阳极熔炉和双阳极铸造车轮正在运行。这代表了该过程的主要变化之一,因为冶炼厂的最终产品现在是阳极铜代替泡罩铜。升压阶段,新的氧气植物,酸厂和其他设施。该环境项目将确保新的冶炼厂将遵守2007年1月底秘鲁的环境法规。本文总结了现代化项目的背景,描述了项目的不同阶段,包括工程,采购和建设,描述了新的铜冶炼厂的主要领域以及它们的预制测试,调试和启动。这是一个棕色的现场项目,其目标是尽可能减少现有操作的生产损失。本文介绍了LLO冶炼厂现代化项目的发展细节,并解释了新设施的主要方面,获得的产品以及其商业化的相关设施,包括用于散装酸出口的海洋桥梁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号