首页> 外文会议>Annual international coal preparation exhbition conference >CONSOL ENERGY'S BMX PROJECT...PREPARING FOR THE FUTURE
【24h】

CONSOL ENERGY'S BMX PROJECT...PREPARING FOR THE FUTURE

机译:Consol Energy的BMX项目...为未来做准备

获取原文

摘要

In 2010, CONSOL Energy entered into the BMX Project which added a 5th Longwall mining machine to the Bailey Complex and increased coal production from 21 million tons to 28 million tons annually. This required upgrading the surface facilities including the raw coal material handling system, preparation plant, clean coal material handling system, train loadout, and rail system over a 3 year period. The Bailey Central preparation plant capacity was increased from 6,200 tph to 8,200 tph in the same building footprint by adding surge bins, larger sieves and screens, desliming cyclones, and replacing vacuum filters and thermal dryers with screen-bowl centrifuges. A 10,000 tph Kanawha Scales Dual Batch Loadout was installed. At the completion of the project in March of 2014, the complex shipped over 2.5 million tons in March, April, and May of 2014. Through several years of engineering and construction, CONSOL Energy's Bailey Complex continues to challenge itself to be the industry leaders in Safety, Compliance and Continuous Improvement.
机译:2010年,CONDOL能源进入BMX项目,将第5个长壁采矿机添加到Bailey Complex,每年增加2100万吨至2800万吨的煤炭产量。这需要在3年内升级升高包括原煤物料处理系统,制备厂房,清洁煤炭材料处理系统,列车装载和铁路系统的表面设施。通过加入浪涌箱,较大的筛和屏幕,脱墨旋风,替代用筛网离心机,将百度中央制备植物容量从6,200英国TPH增加到8,200英尺以8,200 TPH增加到8,200 TPH,并用筛网离心机更换真空过滤器和热风机。安装了10,000 TPH Kanawha缩放双批量装载机。在2014年3月的项目完成时,该复杂于2014年3月和2014年3月的3月份运输了超过250万吨。通过多年的工程和建设,Consol Energy的Bailey Complex继续挑战自己是行业领导者安全,合规性和持续改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号