Engro 40 Years' Experience Of Total Recycle Urea Plant

机译:ENGRO 40年的回收尿素植物的经验

获取原文

摘要

This paper shares the learning's of Engro 40 years' experience, revamping of urea plant to improve efficiency & capacity, many catastrophic incidents & operational emergencies of total recycle urea plant. Engro's urea-1 plant voyage started from 515MTD urea plant with local ammonia venting without vent stack systems to the EPA and OSHA practiced 780MTD capacity plant with two vent stack systems which is the part of this paper. Under the energy improvement drive engro approached casale trays for their latest design and high efficiency trays for the urea reactor. Rapid and complete depressurization of ammonia reservoir (13met) in the atmosphere without vent stack systems is one the major catastrophic incident in the history of engro which lead to in level-2 emergency, as a result of such incidents engro had gone through a wide-ranging project named large ammonia release (LARA) to handle such incidents in future by making the plant inherently safe. Plant major hardware modifications to make it inherently safe are also part of this paper. Urea plant reactor bulged due to weep-hole leakage which causes plant shut down for 40 days, major learning of this incidents are also part of the paper. Bursting of pressure safety devices during startup & shut down was frequent at urea plant in last 30year's. Reactor pressure during aqua ammonia circulation was reduced to max 1500psig from 3000psig and high pressure loop pressure was also maintained at lower side to avoid pressure safety device (PSD) rupturing and hammering. This paper also covers change in urea plant startup & shut down sop which gives rise to 90% decrease in PSD rupture. A pressure safety device is the last line of defense in case of pressurization of any vessel. This paper also covers many incidents, of rupturing of PSD of high pressure decomposer; gas condenser; low pressure decomposer and high pressure absorber cooler, due to abnormal urea plant operations. High pressure decomposer sight glass leakage and emergency plant shut down is also covered in this paper. Some of the incidents eventually came in front in the form of level-1 emergencies. Carbon dioxide carried over about six times in the history of Engro total recycle urea plant operation due to different abnormal plant operations so far. This paper also shares the learning's of C02 carryover emergencies in 40 years' Engro total recycle urea plant.
机译:本文分享了垃圾40岁的学习,改善尿素工厂的经验,提高效率和能力,许多灾难性事件和运营总回收尿素植物的兴奋。 ENGRO的尿素-1植物航行从515MTD尿素厂开始,其中当地氨气发泄,没有通风堆栈系统,向EPA和OSHA练习780MTD容量厂,其中有两个通风堆栈系统是本文的两个通风堆栈系统。在能量改进驱动器下,垃圾接近Casale托盘,为其最新的设计和高效托盘进行尿素反应器。在没有发泄堆栈系统的大气中,在没有发泄堆栈系统的大气中快速和完全减压是垃圾历史中的主要灾难性事件,这导致在2级紧急情况下,由于此类事件垃圾经历了广泛 - 测距项目命名为大氨释放(Lara),通过使工厂固有的安全来处理此类事件。工厂主要的硬件修改使其固有的安全也是本文的一部分。尿素植物反应器由于泻孔泄漏而凸出,导致植物关闭40天,这一事件的主要学习也是本文的一部分。在最近30年的尿素厂频繁,在启动和关闭期间突破压力安全装置。在Aqua氨循环期间的反应器压力降低到最大1500psig,从3000psig,高压回路压力也保持在较低侧,以避免压力安全装置(PSD)破裂和锤击。本文还涵盖了尿素植物启动和关闭SOP的变化,PSD破裂的降低了90%。压力安全装置是任何血管加压的情况下的最后一系列防线。本文还涵盖了许多事故,对高压分解器的PSD破裂;气体冷凝器;由于尿素植物操作异常,低压分解器和高压吸收剂冷却器。本文还介绍了高压分解器视线泄漏和紧急植物。一些事件最终以1级紧急情况的形式出现。由于迄今为止,由于不同的植物业务,垃圾总回收尿素植物运行历史上的二氧化碳持续了大约六次。本文还分享了40年的CO2携带突发事件的学习,垃圾总回收尿素植物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号