首页> 外文会议>Nitrogen + Syngasa International Conference Exhibition >Revamp of two urea plants at Egyptian Fertilizers Company
【24h】

Revamp of two urea plants at Egyptian Fertilizers Company

机译:埃及肥料公司的两种尿素植物改造

获取原文

摘要

During the last four years Egyptian Fertilizers Company (EFC) and ThyssenKrupp Industrial Solutions finalized the revamp of two Urea plants of EFC in Egypt. The revamps of these plants, which had the same starting point with a capacity of 1925 mtpd Urea each, have increased the plants' capacities by 17% to a new capacity of 2250 mtpd each. The revamps cover the synthesis and granulation sections. For a capacity increase of a urea plant additional reaction volume, stripping, evaporation and condensation capacity needs to be installed. With Stamicarbon's MP add-on synthesis a concept is presented here with a minimized number of changes in the high-pressure section of the plant. The main experience of these projects is that by defining the revamp concept only part of the work is done. In order to fulfill all individual requirements of the project a precise investigation of all existing equipment has to be carried out in addition to the design of the newly installed items. Therefore, in addition to the revamp concepts also the experiences made during the engineering phase construction and commissioning are discussed in this paper.
机译:在过去的四年中,埃及肥料公司(EFC)和Thyssenkrupp产业解决方案最终确定了埃及两种EFC尿素植物的改造。这些植物的改造,具有相同的起始点,其容量为1925 mtPD尿素,使植物的容量增加17%,每次2250 mtpd的新容量。改造覆盖合成和造粒部分。对于尿素植物的容量增加,需要安装剥离,蒸发和冷凝能力。使用Stamicarbon的MP附加综合,这里介绍了植物的高压部分的最小化变化数量的概念。这些项目的主要经验是,通过定义改造概念,只完成了一部分工作。为了满足项目的所有个人要求,除了新安装的物品的设计之外,还必须进行所有现有设备的精确调查。因此,除了改造概念之外,还在本文中讨论了在工程相位建设和调试过程中进行的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号