COST-EFFECTIVE MONITORING AND EVALUATION OF THE M2M PILOT PROJECT

机译:成本效益的M2M试点项目监测和评估

获取原文

摘要

Following positive findings of a feasibility study, the Highways Agency has commissioned a pilot project to test the impact of Motorway-to-Motorway Metering (M2M) at Junction 10 Eastbound (EB) on the M62, the intersection between the M6 and the M62. It is crucial that the impacts of the pilot project are accurately assessed, both to understand whether the project has achieved its stated objectives and to inform the Agency's future policy on applying the technology at further locations on the network. A robust and comprehensive evaluation was required, but the economic climate at the time meant it needed to be performed as cost-effectively as possible. An evaluation methodology has been developed and is being followed, covering safety, journey time, flow and emissions aspects. It follows best practice for evaluation of pilot projects but incorporates various innovations to allow a thorough understanding of the performance to be gained at a lower cost than for previous studies.
机译:在可行性研究的积极调查结果之后,公路机构已委托试点项目,以测试高速公路到高速公路计量(M2M)在M62上的交叉路口10(EB),M6和M62之间的交叉点的影响。对于准确评估试点项目的影响至关重要,以了解该项目是否已达到其规定的目标,并告知原子能机构未来在网络上进一步应用该技术的政策。需要一种强大和综合的评估,但是当时的经济环境意味着需要尽可能地成本效益。已经开发了一种评估方法,正在遵循,涵盖安全,旅程时间,流动和排放方面。它遵循评估试点项目的最佳做法,但融入了各种创新,以便彻底了解以较低的成本获得的绩效比以前的研究更低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号