首页> 外文会议>International Conference on Reliability Systems Engineering >Formal Specification and Risk Assessment Approach of Integrated Complex System: A Case Study in IMA Domain
【24h】

Formal Specification and Risk Assessment Approach of Integrated Complex System: A Case Study in IMA Domain

机译:综合复杂系统的正式规范与风险评估方法:IMA域的案例研究

获取原文

摘要

Integrated Modular Avionics (IMA), which is the novel concept of avionics architecture, can effectively improve the efficiency of system while reducing resource allocation. However, it also brings new types of risk such as fault propagation since the flexible mapping between logical configuration and physics configuration. In some way, IMA could be regarded as a network where interdependency relationship between function and resource denotes the edge, function and resource denotes the node. Vulnerability and criticality of nodes are characterized by scheduling frequency and degree, for simplicity, redundancy is not considered.As a safety-critical system, IMA structure itself provides a potential route for fault propagation with the need of flexible resource scheduling. Effective modeling and risk assessment would help for the development bargaining or reconfigure strategy implementing. This paper provides a formal specification and risk assessment approach for integrated complex system and a case study in IMA domain is illustrated.
机译:作为航空电子架构的新颖概念,集成模块化航空电子设备(IMA)可以有效提高系统的效率,同时降低资源分配。但是,它还带来了新的风险,例如故障传播,因为逻辑配置和物理配置之间的灵活映射。在某种程度上,IMA可以被视为一个网络,其中函数和资源之间的相互依赖关系表示边缘,功能和资源表示节点。漏洞和节点的临界的特征在于调度频率和程度,为简单起见,冗余不considered.As安全关键系统,IMA结构本身提供了与需要灵活的资源调度的故障传播一个潜在路线。有效的建模和风险评估将有助于开发讨价还价或重新配置策略实施。本文为集成复杂系统提供了正式的规范和风险评估方法,并说明了IMA域的案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号