Relevancy of Factors and Mitigation Measures in Controlling Time and Cost Overrun Towards Malaysian Environment

机译:在马来西亚环境中控制时间和成本超额的因素与减缓措施的相关性

获取原文

摘要

Construction projects are facing time and cost overrun globally. Since, this problem occurs due to various factors, hence for achieving successful construction projects, it is very important to control the responsible factors causing time and cost overrun. This study assessed the relevancy for each mitigation measures in relation with causative factors of time and cost overrun in Malaysian construction projects. A total of 56 mitigation measures were identified and correlated with the critical factors of time and cost overrun which were categorized into four phases of project life cycle. Data collection was done by conducting structured interviews amongst the experienced practitioners of the southern regions of Peninsular Malaysia.
机译:建设项目正面临时间和成本超支。由于,由于各种因素,因此出现此问题,因此对于实现成功的建设项目,控制造成时间和成本超支的负责因素是非常重要的。本研究评估了与马来西亚建筑项目中的时间和成本超支的造成因素相关的每个缓解措施的相关性。共有56项缓解措施并与时间的关键因素和成本超支的关键因素相关,这被分为四个项目生命周期阶段。数据收集是通过在半岛马来西亚南部地区的经验丰富的从业者中进行结构化访谈来完成的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号