To remove iron sludge, KHNP-CRI applied the dispersant(PAA) at Yonggwang Unit 6. Dispersant Injection term is about 4 months. The full scale PAA trial at YG unit 6 began at 10:30 February 1, 2012 with the injection of 0.5% solution of PAA at about 6 l/hr. The initially injected solution yielded a nominal average PAA concentration 0.25 ppb in the final feedwater with the plant operating at 100% power. During the course of the trial, we are measured the change of water chemistry in the secondary system and effect of iron sludge removal in the SG. And in addition, we analyzed the fouling factor for the thermal performance. PAA appeared to have a small effect on the measured blowdown cation conductivity, raising it by 0.20 uS/cm. Total organic carbon has no change. The iron removal rate at the Hotleg, downcomer and regenerated thermal exchanger is from 1.45 to 3.63 and 7.29 to 23.30 ppb, 42.6to 542.7 ppb respectively. And due to the removal iron, the analysis of total fouling coefficient is raising a little.
机译:为了除去铁污泥,KhNP-CRI在永旺单元施加了分散剂(PAA)6.分散剂注射术期约为4个月。 YG Unit 6的全规模PAA试验在2012年2月1日10:30开始,注射0.5%的PAA溶液,约6L /小时。最初注射的溶液在最终进给水中产生0.25ppb的标称平均PPB,其工厂以100%功率操作。在试验过程中,我们在二级系统中测量了水化学的变化和SG中的铁污泥去除的影响。此外,我们分析了热性能的结垢因素。 PAA似乎对测量的排污阳离子电导率有很小的影响,将其提高0.20 US / cm。总有机碳没有变化。热润光剂,降液管和再生热交换器的铁去除率分别为1.45至3.63和7.29至23.30ppb,42.6至542.7 ppb。由于脱铁,对总污垢系数的分析升高了一点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号