Preliminary Study on Design of Longwall Mining from Final Highwall at Mae Moh Lignite Mine in Thailand

机译:泰国MAE MOH LINGITE LINE Final Highwall Longwall矿业设计的初步研究

获取原文

摘要

The EGAT Mae Moh lignite mine is the largest open-pit coal mine in Thailand. The total geological and economical reserves of Mae Moh coal field are approximately 1,140 Mt and 825 Mt, respectively. The annual production is 12 Mton, which represents 90 % of the total coal production in Thailand, and tends to decrease gradually. In this mine, the development of underground mine from final highwall is considered after the open-pit mining operation is finished. Longwall mining is one of the common methods for extracting coal in various thickness of coal seams and is much more effective, productive and safer than any other mining methods. The productivity of longwall mining is potentially high because it is basically a continuous operation requiring fewer workers and allowing a high production rate to be sustained. Due to unfavorable geological and geotechnical conditions such as weak strata and huge final pit slopes in this mine, however, various studies on the introduction of underground mining systems have been conducted so far. Optimizing boundary and/or safety pillars and panel design for both safety and economics is a key part of planning longwall mines. This paper discribes the applicability of the longwall mining system from final highwall and its suitable design taking the slope stability into consideration by means of three-dimensional explicit finite-difference program FLAC~(3D) producted by ITASCA.
机译:Egat Mae Moh Lignite矿山是泰国最大的露天煤矿。 MAE MOH煤田的地质和经济储备总分别为1,140吨和825吨。年产量为12米尔,占泰国总煤炭产量的90%,往往逐渐减少。在这个矿井中,在露天采矿操作完成后,考虑了从最终高墙的地下矿井的发展。 Longwall Mining是在各种煤层中提取煤的常用方法之一,比任何其他采矿方法更有效,生产和更安全。 Longwall Mining的生产率可能很高,因为它基本上是一个连续的操作,需要较少的工人并允许持续高生产率。然而,由于这个矿井中的弱地层和巨大的最终坑坡等不利的地质和岩土工程,但到目前为止已经进行了关于引入地下采矿系统的各种研究。对安全性和经济学的优化边界和/或安全柱和面板设计是规划长墙矿山的关键部分。本文通过三维明确的有限节目FLAC〜(3D)通过ITASCA产品的三维显式有限差分计划FLAC〜(3D)来抵御最终高墙和其合适设计的适用性及其合适设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号