首页> 外文会议>Conference on Computing in High Energy and Nuclear Physics >Estimating job runtime for CMS analysis jobs
【24h】

Estimating job runtime for CMS analysis jobs

机译:估算CMS分析作业的作业运行时

获取原文
获取外文期刊封面目录资料

摘要

The basic premise of pilot systems is to create an overlay scheduling system on top of leased resources.And by definition, leases have a limited lifetime, so any job that is scheduled on such resources must finish before the lease is over, or it will be killed and all the computation is wasted.In order to effectively schedule jobs to resources, the pilot system thus requires the expected runtime of the users' jobs.Past studies have shown that relying on user provided estimates is not a valid strategy, so the system should try to make an estimate by itself.This paper provides a study of the historical data obtained from the Compact Muon Solenoid (CMS) experiment's Analysis Operations submission system.Clear patterns are observed, suggesting that making prediction of an expected job lifetime range is achievable with high confidence level in this environment.
机译:导频系统的基本前提是在租用资源的顶部创建叠加调度系统。根据定义,租约有一个有限的寿命,因此在租约结束前计划的任何计划都必须完成,或者它将是杀死和所有计算都浪费了。为了有效地将作业有效地安排到资源,因此导频系统需要用户作业的预期运行时间。已经表明,依赖于用户提供的估计不是有效的策略,因此系统应该尝试自身估计。这篇论文提供了一种研究,该研究从紧凑的Muon螺线管(CMS)实验分析操作提交系统中获得的历史数据。观察到清楚的模式,表明可以实现预期工作寿命范围的预测在这种环境中具有高置信水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号