Live Track Railroad Tunnel Repair and Clearance Improvement in the United States

机译:Live Track铁路隧道修理和清关在美国

获取原文

摘要

Double-stack trains in the United States date back to the early 1980s, starting about the time deregulation of the rail industry occurred. Freight rail became increasingly more competitive to trucking and barge or ship, and led to major investments in railroad infrastructure. Since most railroad tunnels in the United States were constructed between 1880 and 1930, they were not built tall enough to accommodate modern double-stack intermodal railcars. Therefore, as double-stack trains became the norm, existing tunnels became bottlenecks, and railroads wanted the tunnels made larger without impacting traffic. This need to increase the clearance while not impacting rail traffic launched a very specialised industry: the design and construction of replacement lining systems in existing tunnels. Several large multitunnel railroad clearance improvement projects have been completed in the country in the last decade, and they have all been done under 'live track' conditions. Live track conditions consist of work windows, often anywhere from four to 12 hours, that are provided to the contractor to complete the construction work. By the end of each work window, the tunnel must be secured so that the railroad can run trains. In addition to improving the clearance, these projects provided the railroads with an opportunity to improve the general condition of the tunnels, including structural, seepage, drainage and icing conditions. This paper discusses the design considerations, tunnel assessments and construction methods used for these live track railroad tunnel projects. Seepage and drainage improvements that were incorporated into the clearance improvement projects are also discussed.
机译:美国的双堆员列表日期回到20世纪80年代初,开始了轨道行业的遏制时间。货运铁轨对卡车和驳船或船舶越来越竞争,并导致在铁路基础设施中进行重大投资。由于美国大多数铁路隧道在1880年至1930年之间建造,因此它们没有足够高的构建以容纳现代双堆栈的多式电路车。因此,由于双堆栈列车成为规范,现有的隧道成为瓶颈,并且铁路希望隧道变大而不会影响交通。这需要增加清关,同时不会影响铁路交通推出非常专业的行业:现有隧道中更换衬里系统的设计和构建。在过去十年中,该国已在该国完成了几个大型多立圈铁路清关项目,并在“现场曲目”条件下。实时曲目条件包括工作窗口,通常在四到12个小时内,提供给承包商完成施工工作。在每个工作窗口结束时,必须固定隧道,以便铁路可以运行列车。除了改进清关,这些项目还提供了铁路,其中有机会改善隧道的一般情况,包括结构,渗流,排水和结冰条件。本文讨论了用于这些实时轨道铁路隧道项目的设计考虑因素,隧道评估和施工方法。还讨论了渗透和排水改善,该改进被纳入清关改善项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号