...
首页> 外文期刊>Engineering news-record >Railroad Tunnel Innovation Keeps Tracks Running Through Reconstruction
【24h】

Railroad Tunnel Innovation Keeps Tracks Running Through Reconstruction

机译:铁路隧道创新通过重建保持轨道正常运行

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

As part of their $3,3-billion U.S.-395 Corridor Project through metropolitan Spokane, the Washington State Dept. of Transportation (WSDOT) needed a structure to span a Burlington Northern Santa Fe (BNSF) railroad track and support a new stretch of Highway 395 above. A conventional girder bridge was proposed, but due to structure size and cost, other options were considered. WSDOT, working with CONTECH, investigated prefabricated tunnel options using either a concrete or a steel plate arch system. BNSF accepted plans for a BEBO arch system, a buried concrete structure often utilized for short and medium span bridges, overpasses and tunnels.
机译:作为其33亿美元的大都会斯波坎市US-395走廊项目的一部分,华盛顿州交通运输部(WSDOT)需要一种横跨伯灵顿北部圣达菲(BNSF)铁轨的结构并支持新的高速公路延伸395以上。提出了传统的箱梁桥,但是由于结构尺寸和成本,考虑了其他选择。 WSDOT与CONTECH合作研究了使用混凝土或钢板拱系统的预制隧道方案。 BNSF接受了BEBO拱系统的计划,BEBO拱系统是一种埋入混凝土结构,通常用于中短跨度桥梁,立交桥和隧道。

著录项

  • 来源
    《Engineering news-record》 |2008年第22期|p.112|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号