Two Transit Levels in One Tunnel Tube - An Innovation in Barcelona Metro Line 9

机译:一条隧道管中的两个过境水平 - 巴塞罗那地铁9号线的创新

获取原文

摘要

Barcelona Metro Line 9 (Line 9) is an essential infrastructure, improving the transversal transport in Barcelona by connecting the greater part of the currently existing radial lines. The purpose of Line 9 is to create a peripheral line surrounding the city of 1.6 million people (metropolitan area exceeds five million), and includes 52 stations, of which a total of 32 are deep shafts and 19 transfer stations in a densely populated area with several geographical constraints. The tunnel has an inner diameter of 10.90 m, bored with an earth pressure balance (EPB) tunnel boring machine (TBM) in soil sections with precast concrete lining type universal ring and segments 40 cm thick. A single tunnel solution was adopted, driven by functionality and costs savings. The internal tunnel section is divided into two levels to allow for one way rail transit including the platforms in each station on each level in order to optimise the space created by the TBM excavation and comply with the operational needs. The division in two areas of the tunnel was carried out through the construction of a horizontal slab resting on the tunnel segments with a constant thickness of 40 cm at the central part of the slab and supporting side walls.
机译:巴塞罗那地铁9号线(第9行)是一项基本基础设施,通过连接当前现有的径向线的大部分来改善巴塞罗那的横向运输。 9号线的目的是创造一个周围的周边,城市160万人(大都市区超过五百万),包括52个站,其中总共32个是深度轴和19个转移站的浓密地区几个地理约束。隧道的内径为10.90米,钻孔与土壤部分中的土压平衡(EPB)隧道钻孔机(TBM)钻孔,具有预制混凝土衬里型通用环和40厘米厚的区段。采用单一隧道解决方案,由功能和成本节省。内部隧道部分分为两个级别,以允许在每个级别的每个站中包括平台的单向轨道转换,以优化由TBM挖掘和符合操作需求创建的空间。隧道的两个区域中的分割是通过在板坯的中心部分处的恒定厚度为40cm的隧道段上的水平板坯进行,并且在板坯的中心部分上的恒定板和支撑侧壁构造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号