首页> 外文会议>Australasian Tunnelling Conference >Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena Tunnel
【24h】

Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena Tunnel

机译:太平洋高速公路从Tintenbar到eWingsdale(T2E),St Helena隧道

获取原文

摘要

St Helena tunnel is the centrepiece of the Pacific Highway upgrade from Tintenbar to Ewingsdale, abbreviated and commonly known as T2E. At the deepest point the twin tunnels run 45 m below the ridge line of St Helena Hill, located about 5 km west of Byron Bay. The tunnel breakthrough was achieved early in 2014 and the works for permanent lining will be completed in early 2015. Once the project will be handed over to the public in 2015, T2E will deliver a safer highway and uninterrupted traffic flow between New South Wales and Queensland. The design speed in the project area has been set to 110 km/h by the client Roads and Maritime Services (RMS), which will reduce the travel times between Brisbane and Ballina to just over two hours. The two tubes of the tunnel have been designed to accommodate three lanes in each direction with shoulders and walkways on either side of the carriageway. These requirements result in a huge cross-section of about 20 m width and an excavated area of about 210 m~2. With the tunnel alignment being situated in basaltic rock, St Helena tunnel is conventionally driven. The selected excavation method was predominantly drill-and-blast with temporary support being installed immediately after the excavation. Despite the wide span of the tunnel, the geology allowed the tunnel perimeter to be supported by only rock bolts and a layer of shotcrete over the majority of its length. Due to environmental reasons one of the approval criteria of the project was that the tunnel must not have a detrimental long-term impact on the groundwater system within St Helena Hill. Consequently the tunnel has been designed as a fully tanked structure with a waterproofing sheet membrane installed on the temporary shotcrete. The permanent structure of the tunnel has to meet a 100-year design life and it is designed as a cast in situ concrete lining. Considering the water pressure on the lining the concrete is reinforced with a significant amount of bar reinforcement. The presented paper provides a more detailed explanation of the geology and the consequential temporary and permanent support measures together with the waterproofing system.
机译:St Helena隧道是从Tintenbar到eWingsdale的太平洋公路升级的核心,缩写,通常称为T2E。在最深的点,双隧道在圣赫勒拿山山脊下方45米,位于拜伦湾西区约5公里。隧道突破于2014年初实现,永久衬里的工程将于2015年初完成。一旦该项目将在2015年移交给公众,T2E将在新南威尔士州和昆士兰州之间提供更安全的公路和不间断的交通流量。项目区的设计速度由客户道路和海事服务(RMS)设定为110 km / h,这将减少布里斯班和巴利纳之间的旅行时间到几个时间。隧道的两个管设计成在行车道两侧的肩部和人行道上容纳三个车道。这些要求导致大约20米宽的巨大横截面,挖掘面积约为210米〜2。随着隧道对准位于玄武岩岩石中,St Helena隧道通常被驱动。所选的挖掘方法主要在挖掘后立即安装临时支撑。尽管隧道宽泛失余,但地质允许隧道周边仅由岩石螺栓和大部分长度的吸尘器支撑。由于环境原因,该项目的一项批准标准之一是隧道在圣赫勒拿山的地下水系统上不得有不利的长期影响。因此,隧道设计为具有完全坦克的结构,其中安装在临时喷射器上的防水板膜。隧道的永久结构必须满足100年的设计生活,它设计为铸造原位混凝土衬里。考虑到衬里上的水压混凝土加强了大量的棒加固。本文提供了对地质的更详细解释以及与防水系统一起进行的地质和永久性支持措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号