首页> 外文会议>Australasian Tunnelling Conference >Full-scale Tests on Precast Tunnel Segments Made in Concrete Reinforced with High-strength Steel Fibres
【24h】

Full-scale Tests on Precast Tunnel Segments Made in Concrete Reinforced with High-strength Steel Fibres

机译:用高强度钢纤维加固混凝土预制隧道区段的全尺度试验

获取原文

摘要

The results of full-scale tests on precast segment made at University of Roma are presented. The segments were cast using fibre-reinforced concrete produced without any traditional reinforcement, by using fiber made in high-strength steel and a new type of anchorage. Bending tests were performed in order to check the bearing capacity of the segments under the flexural actions; these occur during de-moulding, handling, storage phases as well as in the in situ condition (due to asymmetric soil pressure). Furthermore, point load tests simulating the TBM thrust were performed, in order to study the construction phase (excavation). The results show that the segment response largely respects the material testing and design advice according to the Fib Model Code 2010. Providing engineers, precast operators and builders confidence in material strengths and design methodology.
机译:介绍了罗马大学预制段的全规模测试结果。通过使用在高强度钢和新型锚固类型的纤维上使用纤维,使用无需任何传统增强的纤维制造的纤维钢筋混凝土铸造段。进行弯曲试验,以检查弯曲动作下段的承载力;这些在去模制,处理,储存相以及原位状况(由于不对称的土壤压力)期间发生。此外,执行模拟TBM推力的点负载测试,以研究施工阶段(挖掘)。结果表明,该段响应根据FIB模型代码2010的材料测试和设计建议。提供工程师,预制操作员和建筑商对材料强度和设计方法的信心。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号