首页> 外文会议>AusIMM Underground Operators Conference >Understanding the Role of Production Drilling and Drilled Stocks in Efficient Operation of a Sublevel Cave Mine
【24h】

Understanding the Role of Production Drilling and Drilled Stocks in Efficient Operation of a Sublevel Cave Mine

机译:了解生产钻井和钻孔股的作用,以浮出口洞穴矿井有效运行

获取原文

摘要

Proper understanding and management of production drilling in sublevel cave (SLC) mines is essential for meeting production targets and for avoiding inefficiencies that could lead to costly bottlenecks. In many SLC mine management models drilling is considered a derivative activity of firing and bogging. Its scheduling is considered to be implied in a firing schedule and given an arbitrary target completion, 'several weeks' or 'a month', ahead of production firing. Like development, drilling activities are most efficient when conducted separately from other production activities. Unlike development, however, it is not apparent during planning and feasibility how far in advance of firing drilling activities ought to be conducted. This paper presents a method of defining a minimum threshold of drilled stocks above which drilling, firing and bogging operations occur most efficiently. As an example, the drilling activities, procedures, and maintenance at Glencore Xstrata's Ernest Henry Mine are presented, and the larger scale consequences of improvements to these areas are presented to illustrate their importance in the operation of an SLC mine.
机译:适当的理解和管理在Sublevel Cave(SLC)地雷中的生产钻井钻井对于满足生产目标并避免可能导致昂贵的瓶颈的低效率至关重要。在许多SLC矿山管理模型中,钻探被认为是射击和吞咽的衍生活动。它的调度被认为是在射击时间表中暗示,并在生产射击之前,“几周”或“一个月”提供了任意目标完成。与发展一样,钻探活动与其他生产活动分开进行。然而,与发展不同,在规划和可行性期间,在射击钻探活动的进步应该进行的进展情况下是明显的。本文介绍了一种定义最低钻床阈值的方法,高于该钻孔,烧制和凹陷操作最有效地发生。作为一个例子,提出了Glencore XSTRATA的Ernest Henry Mine的钻探活动,程序和维护,提出了改进对这些领域的较大规模后果,以说明他们在SLC矿井操作中的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号