This paper considers data acquired with the newly developed Towed Streamer EM System over The Troll West Oil Province in October 2012. We study how the uncertainties within the data propagate into the estimated 3D resistivity model obtained from inversion. This provides us with associated statistics that is useful in the evaluation of the reliability of the resistivity model. This approach also provides us with the possibility for further improvements of the 3D inversion result and the complete workflow.
展开▼
机译:本文考虑了在2012年10月在Troll West Lock省内采用新开发的拖车流电系统获得的数据。我们研究了数据内的不确定性如何传播到从反转获得的估计的3D电阻率模型中。这为我们提供了在评估电阻率模型的可靠性中的相关统计数据。这种方法还为我们提供了进一步改进3D反转结果和完整工作流程的可能性。
展开▼